BGM Expands Mineralization on Barkerville Mountain

Drilling Intersects 21.91 G/t Gold Over 7.85 Meters 60 Meters From Surface

logo, Barkerville Gold
Barkerville Gold Mines Ltd TSX.V: BGM

TORONTO, July 17, 2019 /CNW/ – Barkerville Gold Mines Ltd. (TSXV: BGM. the “Company” or “BGM“) is pleased to announce the new drilling results from its ongoing Barkerville Mountain exploration program at the Company’s flagship Cariboo Gold Project in central British Columbia.

Deposit Zones, Cariboo Gold Project (CNW Group/Barkerville Gold Mines Ltd.)
Deposit Zones, Cariboo Gold Project (CNW Group/Barkerville Gold Mines Ltd.)
Barkerville Mountain Drilling, Cariboo Gold Project (CNW Group/Barkerville Gold Mines Ltd.)
Barkerville Mountain Drilling, Cariboo Gold Project (CNW Group/Barkerville Gold Mines Ltd.)
Deposit Zones, Cariboo Gold Project (CNW Group/Barkerville Gold Mines Ltd.)
Barkerville Mountain Drilling, Cariboo Gold Project (CNW Group/Barkerville Gold Mines Ltd.)

New results from recent holes of the ongoing Phase 1 exploratory drill program on Barkerville Mountain identified new vein corridors and anomalous intersections on the KL Zone including 6.25 g/t Au over 5.15 meters in drillhole BM-19-022 and 49.63 g/t Au over 2.35 meters on BM-19-025 including a sample that assayed 145 g/t Au over 0.80 meters. The apparent strike length of this system is 1.5 kilometers, outlined from the recent drill results and the Company’s detailed lithological and structural mapping programs conducted over the last two years.

In addition to the recent drilling on the KL Zone, a total of 3,700 meters were drilled in 23 holes to further delineate the BC Vein deposit. Mineralized vein corridors are intersected in the hanging wall of the BC Vein within the sandstone unit and include intercepts of 10.21 g/t Au over 3.30 meters in BCVN-19-004 and 21.91 g/t Au over 7.85 meters in BCVN-19-015 including a sample of 275 g/t Au over 0.60 meters. These vein composites are described as extensional (EXT) or Axial Planar (AXPL) in the table below to differentiate from the BC Vein deposit.

BGM is currently exploring on Barkerville Mountain with three diamond drill rigs to continue testing for vein corridors analogous to Cow and Island Mountain in the hanging wall (north east) of the BC Vein and to continue to delineate and expand the high-grade vein mineralization on Barkerville Mountain KL Zone. A total of 40,000 meters of drilling is planned for Barkerville Mountain this year.

Select Drilling Highlights for Vein Corridors:

  • BM-19-022: 6.25 g/t Au over 5.15 meters
  • BM-19-022: 27.1 g/t Au over 0.50 meters
  • BM-19-024: 32.4 g/t Au over 0.75 meters
  • BM-19-025: 49.63 g/t Au over 2.35 meters including 145 g/t Au over 0.80 meters
  • BM-19-030: 6.71 g/t Au over 3.05 meters including 26.3 g/t Au over 0.55 meters
  • BM-19-033: 6.77 g/t Au over 3.50 meters
  • BM-19-034: 43.6 g/t Au over 0.50 meters
  • BM-19-036: 10.08 g/t Au over 2.70 meters
  • BCVN-19-004:10.21 g/t Au over 3.30 meters
  • BCVN-19-015: 21.91 g/t Au over 7.85 meters including 275 g/t Au over 0.60 meters
  • BCVN-19-016: 5.72 g/t Au over 3.70 meters

True widths are estimated to be 50 to 75% of reported core length intervals. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays.

Select assay highlights from 2019 are presented on the map below. A complete table of assay highlights for BM-19-015 to BM-19-039 and BCVN-19-001 to BCVN-19-023 is present below. The drillhole location and assay highlights are located on the Company’s website:

Barkerville Gold Mines Ltd. 3D Deposit Model 

Mineralized vein corridors on the Cariboo Gold Project are overall sub-vertical dip and northeast strike.  Vein corridors are defined as a high-density network of mineralized quartz veins within the F3 fold axis local to the sandstone horizons.  Gold grades are intimately associated with vein-hosted pyrite, and intensely silicified wall rock haloes in close proximity to the vein corridors.

Fault-fill breccia veins such as that of the BC Vein are subparallel to foliation and hosted in carbonaceous mudstone. This vein is continuous along strike for 1.4 km and is bound on the hanging wall by carbonaceous mudstone, siltstone and interbedded sandstone and on the footwall by calcareous siltstone. The vein dips moderately at 65° to the northeast. Mineralization within the fault-filled breccia vein consists of fine disseminated pyrite in rehealed breccia matrix.

Qualified Persons

Exploration activities at the Cariboo Gold Project are administered on site by the Company’s Project Geologists, Kyle Orrand Felipe Castaneda. As per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Maggie Layman, P.Geo. Vice President Exploration, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on the Cariboo Gold Project.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged.  The remaining drill core is subsequently stored on site at the Company’s secure facility in Wells, BC.  Numbered security tags are applied to lab shipments for chain of custody requirements.  The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS). 

About Barkerville Gold Mines Ltd.

The Company is focused on developing its extensive mineral rights package located in the historical Cariboo Mining District of central British Columbia. Barkerville’s Cariboo Gold Project mineral tenures cover 1,950 square kilometres; along a strike length of 67 kilometres which includes several past producing placer and hard rock mines, making it one of the most well-endowed land packages in British Columbia. Since the management change in mid-2015, the Company has unlocked the fundamental structural controls of gold mineralization. The Company’s Brownfield’s exploration team is focused on upgrading and expanding the May 2018 43-101 compliant resource within the 8 kilometers of principle project area located near the town of Wells, British Columbia.  The Company’s Greenfield’s team is developing quality exploration assets throughout the remaining land package through systematic, scientific, exploration.  The operation’s team is focused on completing required studies in order to permit underground mining on Cow and Island Mountains.

Cautionary Statement on Forward -Looking Information
Neither the TSX Venture Exchange (‘TSXV’) nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Table 1: Length Weighted Gold Composites for Barkerville Mountain KL Zone Holes

HOLE IDDEPTH 
FROM 
(M)
DEPTH 
TO (M)
LENGTH 
(M)
AU (G/T)
BM-19-015299.05300.101.054.05
Including299.05299.600.556.92
333.00333.500.503.07
360.35360.900.559.77
370.30370.800.503.14
393.10393.650.5510.05
398.85399.400.553.91
405.60406.250.658.08
440.00440.500.506.66
446.05448.302.255.17
BM-19-01658.8059.300.503.03
64.8065.300.506.54
115.00115.500.507.72
204.80208.053.253.05
Including204.80205.300.507.14
and207.30208.050.757.18
557.50558.000.505.61
BM-19-017No Significant Assays
BM-19-018153.90156.652.754.56
Including154.90155.400.509.53
632.20632.700.509.41
BM-19-0195.706.500.8010.80
14.3515.000.659.50
21.0021.500.509.87
46.5047.901.403.09
Including47.3047.900.605.75
107.00107.500.505.12
165.55166.050.504.34
232.70233.400.703.99
247.00247.500.5018.55
264.55265.400.855.42
267.00268.001.004.45
350.00350.550.556.95
BM-19-020129.85131.201.355.58
Including130.65131.200.5512.80
152.75155.502.754.37
Including155.00155.500.5019.35
159.30159.900.604.62
163.50164.000.504.13
166.10166.600.509.06
170.35170.850.504.44
172.80175.202.403.52
Including172.80173.400.604.39
and174.70175.200.5011.55
213.20213.850.658.20
223.15223.800.654.23
284.80285.300.5010.65
295.05296.051.003.92
310.45310.950.504.11
314.90316.001.105.96
515.30516.000.707.51
BM-19-021No Significant Assays
BM-19-02232.0033.101.104.67
52.0053.501.504.37
69.0074.155.156.25
109.30110.100.806.32
166.50167.000.504.92
203.00205.002.007.73
Including203.00203.500.5027.10
219.05219.650.6012.40
292.70296.003.303.91
Including292.70293.250.5520.40
BM-19-023Hole Abandoned
BM-19-024207.70209.501.8014.48
Including208.20208.950.7532.40
221.50223.502.004.26
Including222.00222.500.5013.05
296.50297.000.503.71
323.30323.850.5515.80
419.90420.400.503.71
446.90447.450.555.85
484.40484.900.508.01
BM-19-02547.9548.550.603.78
72.1572.950.805.33
80.8581.350.504.84
85.7086.200.508.99
97.2597.750.503.51
122.45124.802.3549.63
Including124.00124.800.80145.00
133.50134.000.504.31
BM-19-026130.00130.500.506.52
174.15179.054.903.57
Including174.15175.000.8514.90
and178.50179.050.557.64
225.00225.500.507.28
293.00293.700.703.10
308.50309.000.5015.15
401.50410.108.603.84
Including402.00403.501.507.99
and409.20410.100.9021.30
BM-19-027195.10195.850.753.28
239.50240.000.503.65
332.00332.500.503.33
421.35421.850.505.27
BM-19-02819.5020.000.504.33
BM-19-029123.30123.800.504.55
212.90213.500.604.62
414.00414.700.704.71
422.35422.850.509.66
463.65464.250.605.47
BM-19-030168.50171.553.056.71
Including168.50169.000.5011.85
and171.00171.550.5526.30
BM-19-031169.40169.900.504.30
BM-19-03236.5037.100.6010.55
44.7045.200.503.77
93.0097.504.504.90
Including93.0093.500.5036.10
120.90122.401.504.85
215.40216.401.004.70
233.50234.000.5027.70
336.70337.300.604.35
375.20375.700.507.15
414.55417.653.102.74
Including414.55415.150.606.84
437.50438.000.504.70
BM-19-03362.8063.400.606.80
138.10138.800.707.78
140.85144.353.506.77
Including140.85141.851.0016.75
and143.80144.350.5512.15
146.15146.650.503.50
147.50148.000.504.30
154.60156.501.903.87
BM-19-03435.1536.050.903.88
158.05158.550.5043.60
183.00183.700.704.69
255.30256.100.8012.75
416.50417.050.554.16
BM-19-03555.0055.500.506.04
BM-19-03650.0050.500.504.07
68.1070.802.7010.08
Including68.1069.000.9012.65
and70.1570.800.6524.20
78.2578.750.507.19
163.50164.000.503.49
345.80346.300.503.61
BM-19-03714.3014.800.506.57
270.00273.103.104.02
435.40436.000.6014.60
BM-19-038135.50136.751.255.93
138.50139.000.503.58
296.55297.250.7017.00
426.00426.600.604.69
597.00597.500.503.69
BM-19-039157.30159.502.203.63
Including158.85159.500.6510.35
182.55183.450.903.97
225.75226.250.5010.40
279.80280.700.905.07
294.40295.751.3516.24
Including295.15295.750.6034.20

Table 2: Length Weighted Gold Composites for BC Vein Holes

HOLE IDDEPTH 
FROM (M)
DEPTH 
TO (M)
LENGTH 
(M)
AU (G/T)VEIN TYPE
BCVN-19-00122.7523.250.505.44EXT
36.9037.400.504.26EXT
101.75102.500.7511.10BCVN
114.85120.105.258.75BCVN
Including115.50116.000.5011.65
and117.50118.000.5014.85
and118.50119.000.5017.45
and119.50120.100.6017.55
BCVN-19-002101.00101.750.758.61EXT
102.90103.400.504.96EXT
107.00107.650.658.94BCVN
114.75115.300.5526.30BCVN
117.30118.301.007.15BCVN
128.95129.700.754.13BCVN
136.50137.200.704.73BCVN
BCVN-19-00377.0077.500.5013.70EXT
113.00113.500.505.43EXT
127.20153.0025.805.11BCVN
Including127.20128.701.5020.20
and129.70130.200.5046.50
and135.00136.001.0025.40
and147.30147.800.5012.45
and147.80148.300.5023.90
BCVN-19-00459.5060.000.505.24AXPL
108.90112.203.3010.21AXPL
Including108.90109.400.5010.40
111.15112.201.0523.70AXPL
118.70119.200.507.10BCVN
126.00126.500.503.24BCVN
129.35130.100.755.08BCVN
BCVN-19-00529.6530.150.504.42EXT
78.6579.400.755.71EXT
98.90106.607.708.91BCVN
Including99.4099.900.508.05
and100.40101.000.6025.60
and104.00104.800.8044.20
BCVN-19-00671.0073.002.004.94EXT
Including71.0071.600.6012.00
and72.5073.000.505.18
139.00151.0012.006.29BCVN
BCVN-19-00728.1528.650.504.63EXT
108.00115.007.0012.83BCVN
Including109.50110.150.6540.30
and110.15111.000.8558.10
and111.00112.301.3010.00
BCVN-19-008116.50117.000.503.87AXPL
125.60149.0023.409.90BCVN
Including125.60126.601.0052.70
and128.00129.501.5016.15
and130.00131.001.0032.40
and131.00132.001.0027.40
and135.00136.001.0036.50
and137.50138.000.5037.50
BCVN-19-00927.3528.150.804.72EXT
93.0093.500.506.96AXPL
100.30106.506.208.35BCVN
Including103.00104.001.0029.80
and104.00104.700.7012.90
and104.70105.250.5513.05
137.50138.000.506.59BCVN
BCVN-19-01074.4075.050.654.13AXPL
140.80142.001.206.76BCVN
147.00148.401.403.48BCVN
BCVN-19-01131.0032.351.354.04AXPL
97.0098.001.007.12AXPL
120.00124.504.504.57BCVN
Including121.65122.250.6021.10BCVN
BCVN-19-01221.1022.451.354.57AXPL
142.70150.007.309.87BCVN
Including145.40146.501.1053.80
and147.20148.501.307.80
BCVN-19-013Hole Abandoned
BCVN-19-01478.8580.001.158.76EXT
135.50138.002.507.33EXT
Including135.50136.000.5027.60
140.50143.252.756.97BCVN
Including142.50143.250.7523.00
BCVN-19-01575.1583.007.8521.91AXPL
Including76.1076.700.60275.00
99.70101.501.803.31AXPL
Includi ng99.70100.200.5010.35
113.90114.400.503.25AXPL
126.40130.303.903.85BCVN
138.05138.800.7536.60BCVN
BCVN-19-01683.1586.853.705.72EXT
Including83.1583.650.506.69
and86.3586.850.5035.20
102.90104.101.205.57AXPL
129.00129.600.603.94AXPL
140.50146.205.704.84BCVN
BCVN-19-01744.2545.000.759.38EXT
97.20105.808.6022.43BCVN
Including97.8099.001.2030.30
and99.00100.201.2060.70
and100.20101.000.8034.90
and101.00102.001.0037.30
BCVN-19-01899.90106.256.3512.07BCVN
Including104.10104.750.6527.20
and104.75105.650.9040.20
and105.65106.250.6025.40
BCVN-19-01949.7550.250.506.47EXT
80.3581.000.653.60EXT
90.8591.600.753.28EXT
BCVN-19-020102.50106.053.5512.46BCVN
Including102.50104.001.507.91
and105.00106.051.0529.50
BCVN-19-021103.00103.900.907.27BCVN
BCVN-19-02295.5096.250.753.38EXT
113.50118.104.606.70BCVN
Including114.85116.101.2523.40
BCVN-19-023106.70107.500.803.12EXT
172.00175.503.507.14BCVN
Including174.00174.500.5010.40

Table 2: Drillhole Collar Orientations:

HOLE IDDIPAZIMUTHDEPTH (M)
BM-19-015-44120495
BM-19-016-46124588
BM-19-017-46123318
BM-19-018-44119651
BM-19-019-45118633
BM-19-020-46119693
BM-19-021-47124300
BM-19-022-45123566
BM-19-023-4511650
BM-19-024-45124648
BM-19-025-46118555
BM-19-026-45121501
BM-19-027-44120501
BM-19-028-45119510
BM-19-029-43118525
BM-19-030-45123522
BM-19-031-46125501
BM-19-032-44119564
BM-19-033-46120501
BM-19-034-45123501
BM-19-035-4612657
BM-19-036-45123582
BM-19-037-46117501
BM-19-038-46117603
BM-19-039-46116549
BM-19-040-45111400
BCVN-19-001-48225150
BCVN-19-002-55224162
BCVN-19-003-48227177
BCVN-19-004-62223171
BCVN-19-005-45228150
BCVN-19-006-52221183
BCVN-19-007-56224177
BCVN-19-008-44214186
BCVN-19-009-52219160
BCVN-19-010-53214180
BCVN-19-011-62219180
BCVN-19-012-54229162
BCVN-19-013-5123051
BCVN-19-014-58229180
BCVN-19-015-51224165
BCVN-19-016-58224180
BCVN-19-017-44223131
BCVN-19-018-51224141
BCVN-19-019-45217177
BCVN-19-020-47227135
BCVN-19-021-53226135
BCVN-19-022-66224150
BCVN-19-023-53232216

SOURCE Barkerville Gold Mines Ltd.

For further information: Chris Lodder, President & Chief Executive Officer, 155 University Avenue, Suite 1440, Toronto, Ontario, Canada, clodder@barkervillegold.com

Related Links

http://www.barkervillegold.com/

Share this on: