Ximen Mining Mobilizing Drill Crew to Brett Epithermal Gold Project — Vernon BC

Vancouver, B.C., July 23, 2024 – Ximen Mining Corp. (TSX.v: XIM) (FRA: 1XMA) (OTCQB: XXMMF) (the “Company” or “Ximen”) announces that it is mobilizing crews and equipment to start the 2024 drill program at its Brett epithermal gold project near Vernon in southern BC.  
Photo showing worker locating a drill hole in the field
The Brett project (20,043 hectares) covers low-sulfidation epithermal-style gold mineralization hosted in Eocene Penticton Group volcanic rocks. Epithermal-style gold mineralization was discovered in 1983, and a 291 tonne surface bulk sample was shipped to the smelter at Trail, BC in the 1990’s that averaged 27.74 grams per tonne gold and 63.7 grams per tonne silver (Brett 2017 NI 43-101 report). Multiple zones of mineralization occur over a two kilometer strike, including both bulk-mineable and bonanza high grade styles.  Ximen conducted LiDAR and airborne magnetic surveys over parts of the Brett property in 2022.  Interpretation, 3D modeling and target refinement were then completed in preparation for the 2024 drilling program.
Map of Mineralized Zones at Ximen’s Brett Project
Longitudinal Section showing Gold Zones at Brett Epithermal Gold Deposit
Readers are cautioned that historical records referred to in this News Release have been examined but not verified by a Qualified Person. Further work is required to verify that historical records referred to in this News Release are accurate.

Dr. Mathew Ball, P.Geo., VP Exploration for Ximen Mining Corp. and a Qualified Person as defined by NI 43-101, approved the technical information contained in this News Release.   
On behalf of the Board of Directors,



Christopher R. Anderson
President, CEO and Director
604 488 3900

  Investor Relations:
Sophy Cesar  |  604 488-3900  |  ir@XimenMiningCorp.com

Share this on: