SNOWLINE GOLD DRILLS 404.8 M OF 2.3 GRAMS PER TONNE GOLD INCLUDING 100.8 M OF 4.7 GRAMS PER TONNE GOLD FROM SURFACE, OUTPERFORMING VALLEY DEPOSIT INITIAL RESOURCE ESTIMATE IN FIRST HOLES OF 2024
Hole V-23-071, collared in a large gap in coverage at the Rogue Project’s Valley deposit, returned 449.7 m averaging 1.77 g/t Au from surface, including 169.2 m of 2.89 g/t